Why the first emerald cut order is mostly a math problem

I have spent twelve years on the production floor, and the first-order conversations that go wrong are almost never about beauty. They go wrong because the buyer priced the stone and forgot the other seven lines. Emerald cut is the least forgiving cut we make: step facets show every inclusion, color band and window, so yield loss on the rough is higher than a brilliant cut and that loss is inside your unit price whether you see it or not.

So before we talk about anything else, let us put the whole landed cost on one sheet. Below is how I would cost a first emerald cut wholesale order today, using real factory numbers rather than the tidy numbers a trading desk will quote you.

02

The six cost lines in a first emerald cut shipment

Every piece you receive carries six costs. Most first-time buyers see line one and line two and assume the rest is rounding.

  • Stone cost: priced per carat, and emerald cut commands a premium because clean rough that survives the cut is scarcer.
  • Metal and setting labor: 925 silver is cheap per gram, but the labor to set a step-cut corner cleanly is not.
  • Certificates: GRA on every piece, IGI when you want a graded report on the larger stones.
  • Packaging and labeling: boxes, pouches, barcode labels, and the labor to match them to your SKUs.
  • Freight: DDP air to most US and EU addresses runs 5 to 8 days door to door.
  • Payment and duty costs: T/T 30% deposit with balance before ship, PayPal for samples, plus whatever your country charges at entry if you are not on DDP terms.
03

A worked example: 47 pieces, three SKUs

Take a realistic first order rather than a round number. A new buyer wants 47 pieces across three sizes: 20 studs at 1.0 ct equivalent, 20 rings at 2.0 ct, and 7 pendants at 3.0 ct. The odd count is deliberate, because it is what actually happens when a buyer tests a category.

Cost lineBasisShare of landed costWhat moves it
StonePer carat, by color and clarity grade52 to 61 percentClarity grade, size, and how much clean rough the cut consumed
Metal and settingPer piece, by setting style14 to 19 percentProng versus bezel, number of accent stones, rhodium finish
CertificatesPer piece3 to 6 percentGRA only versus GRA plus IGI on the larger stones
PackagingPer piece2 to 4 percentCustom boxes, printed inserts, barcode labeling
FreightPer shipment, DDP6 to 11 percentWeight, destination, and whether you consolidate
Payment and dutyPercentage of invoice plus entry fees4 to 9 percentPayPal versus T/T, DDP versus your own broker

Notice that stone is the majority but not the whole story. A buyer who shaves 8 percent off the stone price and pays 11 percent in freight and duty has not saved anything. That is the single most common first-order mistake I see.

04

Where emerald cut specifically changes the math

Step cuts are graded on the eye, and the eye is harsh. A stone that would pass in a brilliant cut can show a visible line in an emerald cut under a loupe. That is why our incoming inspection is not a formality.

Incoming stone check

Every parcel is checked stone by stone before it touches a bench. Color consistency across the batch, windowing, facet alignment, and any surface-reaching inclusion. Stones that fail go back to the cutter, not into your order. This is the stage where a cheap supplier quietly passes the problem to you.

In-process and pre-ship AQL

During setting we check prong coverage, corner clearance on the step facets, and polish. Before shipping we run an AQL sample against the whole order, including a certificate-to-piece match. If a GRA number does not match the stone in the box, the box does not leave.

On a first order, ask for the AQL report and the certificate list before you release the balance. A supplier who hesitates on that request is telling you something.
05

Why our numbers run about 20 percent better

We cut and set in our own facility, so there is no trading company margin stacked on top and no second set of hands re-inspecting work we already inspected. That is the whole reason our cost, speed and yield land roughly 20 percent better than a typical trading company on comparable grades.

Concretely: stock items ship from one to thirty pieces with no tooling charge, custom designs start at 30 pieces, and production runs 12 to 18 days because the stones and the bench are in the same building. A trader quoting you the same 12 to 18 days is usually padding it to cover their own supplier's queue.

06

MOQ, payment and timing for order one

Here is the practical sequence I give every new buyer.

  • Stock designs: MOQ 1 piece, so you can sample before committing.
  • Custom designs: MOQ 30 pieces per SKU.
  • Samples paid by PayPal, production orders by T/T 30 percent deposit, balance before shipment.
  • Production 12 to 18 days after deposit and design sign-off.
  • DDP delivery 5 to 8 days to most US and EU destinations.
  • Certificates: GRA on all pieces, IGI available on request for graded reports.

If you want to talk through your own numbers, WhatsApp is +86 133 7744 7107 and email is service@holycome.com. Send me the SKU list and target retail price and I will tell you where the cost actually sits.

07

Frequently Asked Questions

What is the minimum order for emerald cut wholesale?

One piece for stock designs, which lets you inspect the cut and setting before a larger commitment. Custom designs carry a 30-piece minimum per SKU because the bench has to be set up and the stones sourced to your spec.

How long does a first order take?

Production is 12 to 18 days after deposit and design approval, and DDP freight adds 5 to 8 days to most US and EU addresses. Samples from stock usually move faster because no tooling is involved.

How is the price calculated?

Stone cost is per carat by color and clarity grade, then metal and setting labor, certificates, packaging and freight are added per piece or per shipment. Ask for the breakdown line by line rather than a single unit price, because that is where first-order surprises hide.

Send your SKU list, target quantities and destination country to service@holycome.com or WhatsApp +86 133 7744 7107, and I will come back with a line-by-line landed cost and a sample option so you can check the cut quality before the full order.

Quotation valid for 7 days from issue.Get the price list

Frequently Asked Questions

What is the MOQ for moissanite wholesale orders?

MOQ is 1 stone for samples. Bulk orders are priced by quantity tier; send your cut, carat, color and clarity requirements and we will return a wholesale quotation.

How long is the production and shipping lead time?

Sample stones ship within 7-14 days. Bulk production lead time is 15-25 days after deposit confirmation; international delivery after dispatch typically takes 3-10 business days depending on destination.

How are prices quoted and what payment methods do you accept?

Prices are quoted per carat in US dollars with tiered wholesale pricing. We accept T/T (30% deposit, balance before shipment), PayPal and Western Union for sample and small orders.

Looking for loose stones or a custom cut? Talk to the factory directly.

Send Inquiry

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .