WHOLESALE DESKNov 18, 2026

k gold wholesale: landed cost math for your first order

k gold wholesale: landed cost math for your first order
MOQ20 pcs / style
SAMPLE5-7 days
BULK12-18 days
PAYMENTT/T, 30% deposit

Most first-time buyers ask me for a price per gram and think that settles it. It never does. The number that matters is landed cost per piece in your warehouse, and that number is built from six or seven lines, several of which nobody quotes you upfront.

I have spent twelve years on the production floor at HOLYCOME, checking stones, weighing metal, and signing off pre-ship inspections. This article walks through the arithmetic the way I would explain it to a buyer on a factory visit, with real line items and a worked example.

01

Start with what the metal actually costs you

k gold wholesale pricing starts with the spot price of fine gold, then gets adjusted for the karat you order. A 14K piece is roughly 58.5 percent gold by weight, and 18K is 75 percent. The remaining weight is alloy, and alloy is cheap, but it still gets billed at a fabrication rate.

The mistake I see is ordering by piece count instead of by metal weight. Two pendants can look identical in a photo and differ by 0.4 grams, which at current gold prices is real money across 200 units. Always ask for the average gram weight per SKU before you approve a quote.

Also confirm whether the quote uses a locked gold rate or a floating one. A floating rate means your invoice moves between deposit and shipment. For a first order, ask for the rate to be fixed for 15 days so your margin math holds.

02

Stone cost: where the spread hides

If you are buying moissanite in k gold, the stone line is usually small relative to metal. A 1 carat round brilliant moissanite in VS clarity costs a fraction of a comparable lab-grown diamond, and both are far below natural. But the spread between suppliers on the same grade is wide, because grading language is loose.

Ask for the certificate body by name. We issue GRA certificates for moissanite and IGI for lab-grown diamond, and both are verifiable. A supplier who says "certified" without naming the lab is telling you nothing.

  • Confirm color grade in writing: DEF is not the same as GHI in a photo.
  • Confirm clarity grade: VVS and VS look similar on screen, not under a loupe.
  • Ask for the melee size tolerance, usually plus or minus 0.05mm.
  • Ask whether melee is included in the quote or billed separately.
  • Request the certificate number range for the batch before shipping.
03

The line items buyers forget to budget

Fabrication labor is the second-largest line after metal, and it scales with complexity, not weight. A plain band and a six-prong solitaire can weigh the same and differ by several dollars per piece in labor. Setting charges for pavé are usually per stone, so a halo piece adds up fast.

Then come the small charges: plating on two-tone pieces, rhodium on white gold, laser engraving, individual poly bags, and retail-ready packaging if you need it. None of these are large alone. Together they can add 4 to 8 percent to your unit cost.

Freight and duty round it out. DDP delivery to a US or EU address typically runs 5 to 8 days and bundles the customs clearance into one rate, which simplifies your math considerably compared to FOB plus a separate broker invoice.

04

Worked example: 150 units, 14K, mixed SKUs

Here is a simplified first-order breakdown for a buyer testing three SKUs at 50 pieces each. Numbers are illustrative, not a quote, but the structure is exactly how we build one.

Cost lineBasisShare of landed costNotes
Fine gold contentSpot rate x karat purity x grams52 to 60 percentLargest single line, rate should be locked
Alloy and castingPer gram fabrication8 to 12 percentVaries by karat and color
StonesPer carat or per piece6 to 14 percentDepends on moissanite vs lab-grown
Labor and settingPer piece, complexity-based10 to 15 percentPavé and halo cost more
Freight, duty, insuranceDDP flat rate5 to 8 percentBundled clearance, 5 to 8 days transit

Add packaging and the small consumables on top, and you have a realistic landed figure. Compare that against your expected wholesale sell price, not retail, and you will see whether the SKU is worth repeating.

05

Why our numbers usually beat a trading company

We cut and set in-house, so there is no middle layer marking up metal and labor before it reaches you. That is the concrete reason our cost, speed, and yield typically run about 20 percent better than a typical trading company on the same spec.

It also means fewer surprises. Incoming stone check happens before anything is cast, in-process inspection catches setting defects while the piece is still on the bench, and pre-ship uses AQL sampling against the approved sample. Three stages, documented, with photos.

If a supplier cannot tell you where in the process a defect would be caught, they are not inspecting, they are hoping.
06

Payment terms and how they affect your cash position

Standard terms are T/T with 30 percent deposit and the balance before shipment. For a first order that deposit is your real risk exposure, so keep the order size matched to what you can sell through in 60 to 90 days.

If you want to see samples before committing, PayPal works for sample orders and gives you a dispute channel. Stock items ship from 1 piece minimum, custom production starts at 30 pieces per SKU, and production runs 12 to 18 days after sample approval and deposit.

Build your cash flow model around that 12 to 18 day window plus 5 to 8 days transit, and add a week of buffer for the first order. First orders always have one surprise.

07

Frequently Asked Questions

What is the minimum order for a first k gold order?

Stock designs start at 1 piece, so you can test a SKU cheaply. Custom production requires 30 pieces per design, and the price basis is per piece calculated from metal weight, stone grade, and labor complexity.

How long does production and delivery take?

Production runs 12 to 18 days after deposit and sample sign-off, and DDP delivery adds 5 to 8 days. Certificates from GRA or IGI are issued before the pre-ship inspection, so paperwork does not delay the shipment.

How is the price calculated on a quote?

Each line is itemized: fine gold content at the locked rate, alloy and casting, stones by grade and carat, labor by complexity, then freight and duty. Ask for the gram weight per SKU and the gold rate lock period in writing before you compare two quotes.

If you want this math run on your actual SKUs, send the designs and target quantities to service@holycome.com or message WhatsApp +86 133 7744 7107 and we will return an itemized landed cost sheet plus sample availability.

Quotation valid for 7 days from issue.Get the price list

Frequently Asked Questions

What is the MOQ for moissanite wholesale orders?

MOQ is 1 stone for samples. Bulk orders are priced by quantity tier; send your cut, carat, color and clarity requirements and we will return a wholesale quotation.

How long is the production and shipping lead time?

Sample stones ship within 7-14 days. Bulk production lead time is 15-25 days after deposit confirmation; international delivery after dispatch typically takes 3-10 business days depending on destination.

How are prices quoted and what payment methods do you accept?

Prices are quoted per carat in US dollars with tiered wholesale pricing. We accept T/T (30% deposit, balance before shipment), PayPal and Western Union for sample and small orders.

Looking for loose stones or a custom cut? Talk to the factory directly.

Send Inquiry

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .