WHOLESALE DESKNov 9, 2026

Moissanite Education Made to Order: What the

Moissanite Education Made to Order: What the
MOQ20 pcs / style
SAMPLE5-7 days
BULK12-18 days
PAYMENTT/T, 30% deposit
01

What the Quote Actually Covers

Last September, a US buyer of moissanite Education placed 50 moissanite Education against a sample signed in February. The first container landed with 9 pieces that failed on double refraction read alone, and USD 20-75 landed on the buyer's P&L before a single unit sold, and 50 pieces leaves Wuzhou in single-piece foam box at USD 35-237.

On a 50-piece order at USD 35-237, a double refraction read rate above two percent is not a quality surprise. It is a costing error that shows up as a credit note three weeks later.

Moissanite Education wholesale piece from the HOLYCOME line in Wuzhou

Nothing in the rebuild was expensive. A gauge, a written limit and a retained tray did the work that a discount would only have delayed, which is USD 35-237 on the Made to Order schedule.

02

The Made-to-Order Path for moissanite Education

Made-to-order is a different production line, not a slower version of stock. It starts with a signed drawing, then a wax or resin model, then a casting, then setting, then finish, and each stage can fail on its own, and the Made to Order quote for it sits at USD 35-237.

Twenty days is realistic for a new moissanite Education when the model exists and only the stone changes. A new model adds a day for the CAD, a day for the print, and a day for the buyer to approve the render before metal is committed, on a 50-piece Made to Order order at USD 35-237.

The risk sits in approval, not in the bench. A buyer who approves a render on a phone screen and rejects the casting has bought a prototype, not a product. We send the render at 1:1 scale with a millimetre grid for that reason, which is how the Made to Order account reads it at USD 35-237.

Moissanite Education setting and finish detail on a HOLYCOME factory sample
03

The Three Failures We See Most in Incoming Samples

color batch drift

Two lots graded near-colorless can sit two shades apart under daylight. Batch the stone buy per order rather than across quarters, quoted at USD 35-237 per piece in single-piece foam box.

Our countermeasure is a gauge and a written limit. It adds about 17 seconds per piece and removes the defect from the run rather than from the carton, and 50 pieces leaves Wuzhou in single-piece foam box at USD 35-237.

girdle chipping

Stones set with a tight prong and no seat cut chip at the girdle during setting. The chip appears after shipping, not on the bench, certified IGI report and packed single-piece foam box at 50 pieces.

In a 50-piece run this typically shows on 17 of pieces. Catching it means measuring color consistency within one lot at the tray level, not inspecting the finished carton, and the Made to Order quote for it sits at USD 35-237.

double refraction read

Moissanite shows doubled facet reflections under a loupe. Buyers who compare it to diamond without disclosing this face a return, not a defect, and 50 pieces leaves Wuzhou in single-piece foam box at USD 35-237.

The commercial effect is stone swap and a disclosure issue, typically USD 12-20 per piece. Buyers who have seen it once put it in the purchase order; buyers who have not usually discover it on the first return, which is how the Made to Order account reads it at USD 35-237.

04

What US buyers Check Before They Sign

At USD 35-237 per piece the four measurements below are worth more than the discount being negotiated. One of them costs nothing to write down.

Spec pointCommon trade outputHOLYCOME standardCost if missed
Clasp spring lifeSampled by handCycled 500 times on a jig per lotDetach claim and brand damage
Prong tension and seat depthChecked by feel at the benchPull-tested per piece, seat depth written on the sheetStone loss and total replacement
Hallmark depth and placementStamped where it fitsFixed position, depth measured so it never breaks the shankCustoms query and remaking
Solder flow at the jointNot inspectedJoint inspected under 10x before settingCrack at the seam in transit

Write these into the Made to Order purchase order and the arrival check becomes arithmetic instead of recollection, and 50 pieces leaves Wuzhou in single-piece foam box at USD 35-237.

05

Order Terms, Sample Timing and Packing

The commercial frame is short enough to state in full. Minimum order is 50 pieces per design, and mixed designs travel in one shipment, so a 50-piece Made to Order order can carry three or four models without a separate setup charge. Sample pieces leave in 3-5 days when the components are in stock, and a new model adds about twenty days before the first article exists, which the Made to Order file records at USD 35-237 in single-piece foam box.

Payment is 30 percent with the order and 70 percent against the bill of lading, with the balance window stated on the invoice rather than agreed by message. Prices quoted at USD 35-237 are FOB Guangzhou or Shenzhen; DDP is quoted separately because the duty line moves with the tariff schedule and not with our cost.

Packing follows the single-piece foam box format at 50 pieces to the carton, and the packing list carries SKU, size and stone size so receiving can count without opening every box. Private-label cartons add three days for the print run and must be approved before the first bulk order, not after it, priced at USD 35-237 for the 50-piece Made to Order run.

Certification is IGI report for the lots that carry it, with a batch report and per-piece measurement of color consistency within one lot for the lots below the threshold. The document set travels with the shipping papers, which is what a customs broker asks for at the port rather than after clearance, with IGI report and single-piece foam box stated on the same sheet.

A rejected tray is settled inside the same order cycle against the retained reference piece. If the difference sits on our retained sample we replace or credit; if it appeared in transit we split the assay cost and file with the carrier, and that rule is written on the order before the deposit clears, the figure being USD 35-237 for a 50-piece run.

06

Where USD 35-237 Per Piece Actually Goes

Cost at USD 35-237 leaves no room for assumption. The table shows which line compresses and which line only moves quality down.

Cost lineShareWhat moves it
Base metal or alloy for moissanite Education30%Alloy choice and casting yield
Stone or melee for moissanite Education20%Sieve range and lot batching
Setting and finishing labor for moissanite Education19%Jig design and bench minutes
Plating, polish and QC for moissanite Education12%Per-tray versus per-piece checks
Packaging for moissanite Education19%single-piece foam box

A factory that cannot state its bench minutes per piece has never costed its own line. Ask for minutes and for the reject rule, not for a discount, and the Made to Order quote for it sits at USD 35-237.

07

Sample to Container: The Real Calendar

The answer for moissanite Education depends on four variables, and three of them are under the buyer's control, priced at USD 35-237 for the 50-piece Made to Order run.

Three numbers decide it for moissanite Education: the tolerance band, the inspection density and the responsibility clause. Write all three down and the rest of the negotiation is arithmetic. Leave any of them out and it becomes a discussion about intent, which the Made to Order file records at USD 35-237 in single-piece foam box.

We send a one-page sheet with every moissanite Education quote that states those three, plus the retained-tray rule. Buyers who compare on it usually find that the gap between suppliers is smaller than the gap between the specs they were comparing, certified IGI report and packed single-piece foam box at 50 pieces.

08

AQL, Tray Checks and What a QC Report Should Say

In the American bridal market, this is the single most negotiated line on moissanite Education and the least documented one, certified IGI report and packed single-piece foam box at 50 pieces.

There is a version of this that looks cheaper on paper and costs more in practice: quoting the best case on moissanite Education and letting the buyer discover the spread. It works once. The second order goes to whichever supplier quoted honestly, with IGI report and single-piece foam box stated on the same sheet.

We would rather lose a first order of moissanite Education on price than explain a defect after it lands. That position is unusual in this category and it is the reason our reorder share is high, with IGI report and single-piece foam box stated on the same sheet.

09

What This Means for a First Order

A first Made to Order order of 50 pieces per design at USD 35-237 tests the line rather than the range. Three designs covers the shelf.

Ask for the retained tray and the IGI report batch sheet with the first shipment. Both are free and both decide the reorder, with IGI report and single-piece foam box stated on the same sheet.

10

Freight, Duty and the Arrival Check

Export runs through Guangzhou or Shenzhen. Air lands in 5-8 days on the US west coast, 7-10 on the east, and sea takes roughly three times the transit, which the Made to Order file records at USD 35-237 in single-piece foam box.

FOB is the default on moissanite Education and DDP is the option. Buyers new to the American bridal market usually take DDP once, then switch after they see the breakdown, quoted at USD 35-237 per piece in single-piece foam box.

If double refraction read appears in the arrival check, the retained tray decides who owns it. Keep the IGI report batch sheet in the same folder as the packing list, certified IGI report and packed single-piece foam box at 50 pieces.

11

How a Repeat Order Gets Built

Nothing in this sequence is unusual, and that is the point. Each step exists because skipping it produced a specific failure on a previous order, and 50 pieces leaves Wuzhou in single-piece foam box at USD 35-237.

  1. Sign the drawing at 1:1 scale with a millimetre grid, not a phone render.
  2. Cut the model in wax or resin and photograph it on the gauge before metal is committed.
  3. Cast the first article, set the stones and finish it exactly as bulk will be finished.
  4. Send the first article for approval with the weight and the stone measurements stated.
  5. Run the balance of the order in 25-30 days, holding the approved article as the reference.
  6. Ship with the approved article photographed beside a production piece from the same tray.

Reorders inside this sequence run 12-15 days because the model, the gauge set and the signed spec stay in our system, which is how the Made to Order account reads it at USD 35-237.

12

Frequently Asked Questions

Can you ship DDP?

DDP is available for US accounts and removes the duty invoice that arrives after the carton clears. FOB Guangzhou or Shenzhen is the default, and most buyers take DDP once and then switch after they see the breakdown, which is USD 35-237 on the Made to Order schedule.

How long does a reorder of the same moissanite Education take?

With the model, the gauge set and the signed spec already in our system, a repeat is 12-15 days; a first run is 3-5 days for a stock-component sample and about 20 days when a new model is needed, certified IGI report and packed single-piece foam box at 50 pieces.

What finish do you use, and how thick is it?

Rhodium at 0.20 micron minimum on white moissanite Education, with a palladium strike layer so wear-through reads white rather than yellow. Vermeil runs at 3 microns over sterling and is logged per lot, certified IGI report and packed single-piece foam box at 50 pieces.

How is moissanite Education packed for single-piece foam box?

Every unit goes into a foam-backed pouch, then the single-piece foam box, then the outer carton at 50 pieces. The packing list carries the SKU, the size and the stone size so receiving can check without opening every box, and the Made to Order quote for it sits at USD 35-237.

Can you ship DDP?

DDP is available for US accounts and removes the duty invoice that arrives after the carton clears. FOB Guangzhou or Shenzhen is the default, and most buyers take DDP once and then switch after they see the breakdown, which is USD 35-237 on the Made to Order schedule.

13

Next Step

The next step is a sample in 3-5 days, not a container. Write to service@holycome.com or WhatsApp +86 133 7744 7107, subject Made to Order, and at USD 35-237 for 50 pieces that is the number the buyer signs.

HOLYCOME is operated by Wuzhou HengliLai Jewelry Co., Ltd., a factory in Wuzhou, Guangxi, producing since 2009 at roughly 60,000 pieces a month. Contact service@holycome.com or WhatsApp +86 133 7744 7107, on a 50-piece Made to Order order at USD 35-237.

Related reading: Moissanite Education Private Label Carton: MOQ, Mixed Designs and the Real First Orde - HOLYCOME Cutting & Craft Q4 Holiday Stock: How the Second Order Becomes Cheaper - HOLYCOME

Quotation valid for 7 days from issue.Get the price list

Frequently Asked Questions

What is the MOQ for moissanite wholesale orders?

MOQ is 1 stone for samples. Bulk orders are priced by quantity tier; send your cut, carat, color and clarity requirements and we will return a wholesale quotation.

How long is the production and shipping lead time?

Sample stones ship within 7-14 days. Bulk production lead time is 15-25 days after deposit confirmation; international delivery after dispatch typically takes 3-10 business days depending on destination.

How are prices quoted and what payment methods do you accept?

Prices are quoted per carat in US dollars with tiered wholesale pricing. We accept T/T (30% deposit, balance before shipment), PayPal and Western Union for sample and small orders.

Looking for loose stones or a custom cut? Talk to the factory directly.

Send Inquiry

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .