Synthetic Stones Bulk Supplier: incoming QC and rejection rates
Incoming Stone Inspection: The First Line of Defense Every piece of synthetic stone that arrives at HOLYCOME undergoes a rigorous …

When you’re lining up a new shipment of synthetic stones, the math behind your reorder schedule can save you months of waiting. Our production cycle lasts 12‑18 days, yet the lead from order to delivery is influenced by stock levels, custom settings, and your payment method. If you lock in a 30‑piece custom run, the total cycle extends by an extra week for setting and polishing approvals.
On the other hand, ordering a single piece for stock pushes you into the batch‑processing queue. We consolidate identical orders to keep our three‑stage QC efficient, meaning a 1‑piece order still enjoys the same 12‑18 day production window, but its shipment may arrive a few days later than a larger batch.
Our minimum order quantity for stock items is just one piece, which is great for buyers who want a quick test or a single piece for a collection. For custom designs, the MOQ climbs to thirty pieces. This shift ensures the setting and polishing lines are fully utilized and reduces per‑unit cost.
Because of these requirements, buyers often schedule a minor reorder when the inventory of a particular stone dips below the MOQ threshold. By planning a reorder for, say, 40 pieces instead of 30, you maintain a buffer that smooths out any unexpected demand spikes while still keeping unit cost favorable.
To calculate the optimal reorder point, start with your average monthly consumption. Divide that by the lead time in months to get the safety stock level. Then add a buffer that covers the longest possible delay—usually one extra production cycle and one shipping day.
| Stone | Lead Time (days) | Monthly Consumption | Reorder Point |
|---|---|---|---|
| Moissanite 0.5 ct | 15 | 20 pcs | 40 pcs |
| Lab‑grown Diamond 0.3 ct | 18 | 15 pcs | 35 pcs |
| 925 Silver Setting | 12 | 30 pcs | 50 pcs |
Immediately after receipt of your order and the 30% deposit, our team initiates the first stage of QC: incoming stone verification. We check clarity, color, and cut against GRA or IGI standards, documenting each sample before polishing.
Once the stone passes the first check, it moves to the in‑process stage where we set and polish. A final pre‑ship AQL audit ensures the finished piece meets your specifications before we ship via DDP to the US or EU. The whole cycle stays within the advertised 12‑18 days.
Pricing scales with volume. The first 20 percent of your order gets a flat rate, and every 10 percent increment above that sees a small discount. The 30‑piece MOQ for custom orders applies the same rate structure, but the lead time bumps to 18 days. For stock pieces, the MOQ is one, and the lead time stays at 12 days.
Payment terms remain consistent: a 30% T/T deposit followed by balance due before shipping. For samples, we accept PayPal and can ship the first 5 pieces within 5‑8 days DDP to the US. After the initial deposit, we lock in the spot price for the duration of the production batch.
Our production cycle for custom orders takes 12‑18 days, with a 30‑piece MOQ. The lead time includes set‑up, polishing, and final QC.
No, the MOQ for custom designs is 30 pieces. If you need a smaller quantity, you can order stock pieces for a single unit sample.
No, we require a 30% deposit via T/T before production begins. The remaining balance is due before shipment.
MOQ is 1 stone for samples. Bulk orders are priced by quantity tier; send your cut, carat, color and clarity requirements and we will return a wholesale quotation.
Sample stones ship within 7-14 days. Bulk production lead time is 15-25 days after deposit confirmation; international delivery after dispatch typically takes 3-10 business days depending on destination.
Prices are quoted per carat in US dollars with tiered wholesale pricing. We accept T/T (30% deposit, balance before shipment), PayPal and Western Union for sample and small orders.
Looking for loose stones or a custom cut? Talk to the factory directly.
Send InquiryWritten by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.
Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.
Reviewed for accuracy by our quality team before publication. Last updated .
Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.
Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.
Reviewed for accuracy by our quality team before publication. Last updated .
Incoming Stone Inspection: The First Line of Defense Every piece of synthetic stone that arrives at HOLYCOME undergoes a rigorous …
Understanding Our Production Calendar When you order from a synthetic stones factory direct, the timeline starts the moment the or…
How We Start the Process: Incoming QC for Synthetic Stones Every batch of lab‑grown diamonds and moissanite begins with a rigorous…
Understanding Production Lead Times for Synthetic Stones in Private Label OrdersWhen you decide to launch a private‑label line wit…
Durability Matters: Understanding Stone Settings When you ship synthetic stones to retailers, the settings must withstand daily we…