WHOLESALE DESKNov 18, 2026

Synthetic Stones Wholesale: Landed Cost Math for a First

Synthetic Stones Wholesale: Landed Cost Math for a First
MOQ20 pcs / style
SAMPLE5-7 days
BULK12-18 days
PAYMENTT/T, 30% deposit
01

Why the Unit Price on the Quote Is Not Your Cost

I have watched buyers negotiate a stone price down by four cents and then lose forty cents a piece on freight, duty, and rework. The quoted number per carat is only the first line of a longer sheet. If you are placing a first order for synthetic stones wholesale, the number that decides whether you reorder is the landed cost per sellable piece, not the FOB price.

This article walks the math the way I do it on the floor, with realistic first-order volumes and the costs that show up after the invoice is signed. Nothing here is theoretical; these are the line items I have argued about with buyers and forwarders for over a decade.

02

The Five Cost Lines That Make Up Landed Cost

Every first order has the same skeleton. The proportions shift with volume and stone grade, but the categories do not.

  • Stone and setting cost, priced per carat or per piece, with grade and size driving most of the variance.
  • Certificate cost, usually per stone for GRA cards and per parcel or batch for IGI reports.
  • Freight, which for small parcels is often a flat express rate rather than a per-kilo calculation.
  • Duty and import VAT or sales tax, charged on the declared value plus freight in most destinations.
  • Defect and rework allowance, the invisible line most first-time buyers forget to add.

Add those five and divide by the number of pieces you can actually sell. That is your real cost basis.

03

A Worked Example: 200 Pieces of 1ct Moissanite Studs

Say you order 200 pairs of 1ct round brilliant moissanite studs in 925 silver, GRA carded, DDP to a US warehouse. Stone cost lands around 2.10 to 2.60 per carat at the 1ct grade with acceptable color, so a pair carries about 4.40 to 5.20 in stones. Silver setting, posts, and backs run roughly 3.20 to 4.00 per pair depending on the finding quality.

Certificates at the GRA level are cheap in bulk, often under 0.60 per card when you take them with the order. Freight on a 200-pair parcel is a flat express charge, not a per-piece cost, so it spreads thin. Duty and tax depend on your destination, but budget 5 to 12 percent of declared value for most US and EU entries. Defect allowance is the one to watch: on a first order, plan 2 to 4 percent for stones that fail your own incoming check.

Cost linePer pair, lowPer pair, highNotes
Stones (2 x 1ct)4.405.20Grade and color dependent
Silver setting and findings3.204.00Rhodium plating included
GRA cards1.201.20Two cards per pair
Freight, spread0.350.55Flat express, divided by volume
Duty and tax0.551.10Destination dependent

Land the pair somewhere between 9.70 and 12.05 before defect allowance. Add 3 percent for rework and you have your true cost. If your retail or wholesale sell price does not clear that by a healthy margin, the order is not worth placing at this grade.

04

Where First Orders Actually Leak Money

Certificate mismatch

Buyers pay for IGI on every stone when only the top tier needs it. GRA cards cover the bulk, and IGI reports belong on the pieces you use for hero photography or premium listings. Splitting the certificate spend by tier usually saves more than the stone negotiation.

Freight on tiny parcels

A 30-piece trial order shipped express can carry a freight cost per piece that rivals the stone cost. Consolidate your first order to at least a few hundred pieces, or accept that the trial is a sampling expense, not a cost model.

Defect allowance ignored

Nobody wants to budget for failure, but a first order from a new supplier always carries some. Plan the allowance, inspect on arrival, and claim against it. Suppliers who run three-stage QC, incoming stone check, in-process, and pre-ship AQL, tend to come in under that allowance, which is exactly why the allowance is worth writing down.

If a supplier cannot tell you what their pre-ship AQL sampling plan is, your defect allowance should double.
05

Why Factory-Direct Changes the Math by About 20%

Trading companies add a margin and a handling layer, and they usually cannot control yield. When we cut and set in-house, the same order runs roughly 20 percent better on cost, speed, and yield, because there is no middle layer taking a cut and no re-inspection delay between production and shipping. A 12 to 18 day production window is realistic when the stones and settings are under one roof.

That advantage shows up in three places on your sheet: a lower stone line, a shorter cash cycle because you are not waiting on a third party to consolidate, and a lower defect allowance because the pre-ship check happens before the box leaves the building. It does not make the order cheap. It makes the landed cost predictable.

06

Payment Terms and What They Cost You

Standard terms on a first order are 30 percent T/T deposit with the balance before shipment. PayPal is fine for samples and small trial quantities, and the fee is worth it for the buyer protection on a first transaction. Do not wire a full first-order payment to a supplier you have not sampled; the deposit structure exists for a reason.

DDP delivery to a US or EU address typically runs 5 to 8 days once the parcel is released. Build that into your launch date, not into your cost per piece, because it is a flat charge at most first-order volumes.

07

What to Put in the First Order to Get Clean Numbers

The cleanest first order is small enough to inspect fully and large enough that freight and certificates spread. MOQ is 1 piece on stock items and 30 pieces on custom work, so you can build a mixed order that tests several SKUs without overcommitting. Ask for the stone grade in writing, the certificate type per SKU, and the pre-ship inspection criteria.

Then run the five-line math yourself before you approve the deposit. If the landed cost per sellable piece does not work at your target sell price, change the grade or the certificate tier, not the supplier. The supplier is rarely the problem on a first order; the specification is.

08

Frequently Asked Questions

What is the minimum order for a first synthetic stones wholesale order?

Stock items start at 1 piece, and custom designs start at 30 pieces per style. Mixed orders are fine, which lets you test several SKUs without committing to a full production run.

How long does production and delivery take?

Production runs 12 to 18 days depending on the mix and certificate tier. DDP delivery adds 5 to 8 days after release, so a first order typically lands within about four weeks of deposit.

How is price calculated, and what certificates are included?

Price is quoted per carat for loose stones and per piece for finished jewelry, with grade and size as the main variables. GRA cards are standard, IGI reports are available on selected SKUs, and certificate cost is itemized separately so you can see it in the landed cost.

Send your SKU list and destination address to service@holycome.com or WhatsApp +86 133 7744 7107, and we will return a quote with the five cost lines broken out and a sample parcel option so you can verify the grade before the deposit.

Quotation valid for 7 days from issue.Get the price list

Frequently Asked Questions

What is the MOQ for moissanite wholesale orders?

MOQ is 1 stone for samples. Bulk orders are priced by quantity tier; send your cut, carat, color and clarity requirements and we will return a wholesale quotation.

How long is the production and shipping lead time?

Sample stones ship within 7-14 days. Bulk production lead time is 15-25 days after deposit confirmation; international delivery after dispatch typically takes 3-10 business days depending on destination.

How are prices quoted and what payment methods do you accept?

Prices are quoted per carat in US dollars with tiered wholesale pricing. We accept T/T (30% deposit, balance before shipment), PayPal and Western Union for sample and small orders.

Looking for loose stones or a custom cut? Talk to the factory directly.

Send Inquiry

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .